H58 - OPERATING CENTER OF THE UNIVERSITY HOSPITAL CARL GUSTAV CARUS AT THE TU DRESDEN RENOVATION AND REORGANISATION

The project included complex renovation, fire protection renovation and pollutant remediation as well as restructuring and reorganization of functional units of the operating center.

As part of the complex renovation, the complete fire protection renovation was carried out, the
Implementation of all technical and structural utility value requirements,
Complete renovation of the building technology, the classification of the steam generator and the
spatial redistribution of building services systems.

Functionally restructured or reclassified: central sterilization and bed preparation, five operating rooms and adjoining rooms, one operating room as a hybrid operating room (1st floor), four operating rooms 1TAV and adjoining rooms (2nd floor), PACU - twelve beds (2nd floor), combination of washrooms for doctors, internal medicine emergency room, IMC - internal medicine admission ward,
CT and angiography. The bed storage was arranged on the top floor.

SCOPE OF SERVICES

Object planning LP1-8

COST

Construction phase 1: 21.1 million euros

Construction phase 2: 26 million euros

AREA

 9,932 m² GFA

PROJECT PERIOD

Construction phase 1: 2017 - 2020

Construction phase 2: 2021 - 2025